Arizona Administrative Code (Last Updated: November 17, 2016) |
Title 18. ENVIRONMENTAL QUALITY |
Chapter 14. DEPARTMENT OF ENVIRONMENTAL QUALITY - PERMIT AND COMPLIANCE FEES |
Article 2. PUBLIC WATER SYSTEM DESIGN REVIEW FEES |
Table 1. Design Review Service Fees
All data is extracted from pdf, click here to view the pdf.
-
Public Water System Design Review Application Types
Fees1, 2
Approval to Construct Public Water Supply Distribution System:
$900
• 150 or fewer service connections
• 151 to 300 service connections
$1,400
• 301 to 450 service connections
$1,900
• 451 to 600 service connections
$2,400
• 601 to 750 service connections
$2,900
• Each additional 150 service connections
Add $500
Water Treatment Plants and Blending Plans (including new source approval if applicable):
$1,500
• < 0.1 mgd
• ³ 0.1 mgd and < 1 mgd
$2,000
• ³ 1 mgd and < 5 mgd
$3,000
• ³ 5 mgd
$5,000
Well (including new source approval if applicable)
$1,250
Storage Tank
$800
Booster Pump
$800
Main Line Extension
$250
Chlorinators/Disinfection Devices
$250
Extension of Time to Construct3
50% of the application fee, not to exceed $500
Priority Review Fee4
Double the Standard Fee
1 Fees are calculated on a per-unit basis; i.e., a separate fee is assessed for each separate storage tank, booster pump, dis- infection device, or main line extension.
2 Fees for each application type are cumulative; an applicant must pay the total of all pertinent fees.
3 Extensions of time to construct are issued pursuant to A.A.C. R18-5-505(E); the Section states that an Approval to Construct becomes void if construction is not commenced or completed within a specified time period, unless the Department grants an extension of time.
4 Priority Review Projects require Department authorization prior to filing.
Historical Note
Table 1, Design Review Service Fees, made by final rulemaking at 14 A.A.R. 4102, effective December 6, 2008 (Supp. 08-4).