Arizona Administrative Code (Last Updated: November 17, 2016) |
Title 12. NATURAL RESOURCES |
Chapter 15. DEPARTMENT OF WATER RESOURCES |
Article 4. LICENSING TIME-FRAMES |
Table A. Licensing Time-frames
All data is extracted from pdf, click here to view the pdf.
-
No.
License
Legal Authority
Completeness Review (Days)*
Substantive Review (Days)*
Overall Time-frame (Days)*
1
Filling a body of water with poor quality water
A.R.S. § 45-132(C)
30
60
90
2
Interim water use in body of water
A.R.S. § 45-133
30
60
90
3
Temporary emergency permit for use of surface water or groundwater in body of water
A.R.S. § 45-134
10
20
30
4
Permit to appropriate water (non-instream flow)
A.R.S. §§ 45-151 and 45-153
30
420
450
5
Permit to appropriate water (instream flow)
A.R.S. §§ 45-151 and 45-153
50
530
580
6
Change in use of water
A.R.S. § 45-156(B)
30
375
405
7
Exception to limitation on time of completion of construction
A.R.S. § 45-160
5
15
20
8
Primary reservoir permit
A.R.S. § 45-161
30
420
450
9
Secondary reservoir permit
A.R.S. § 45-161
30
420
450
10
Certificate of water right (non-instream flow)
A.R.S. § 45-162
20
100
120
11
Certificate of water right (instream flow)
A.R.S. § 45-162
20
190
210
12
Reissuance of permit or certificate held by the United States or State of Arizona
A.R.S. § 45-164(C)
10
80
90
13
Severance and transfer
A.R.S. § 45-172 (excluding 172.6)
30
390
420
14
Stockpond certificate
A.R.S. § 45-273
30
190
220
15
Transporting water from this state **
A.R.S. § 45-292
120
300
420
16
Waiver of water conserving plumbing fixture requirement
A.R.S. § 45-315
10
3
13
17
Irrigated acreage in an irrigation non-expansion area
A.R.S. § 45-437
30
90
120
No.
License
Legal Authority
Completeness Review (Days)*
Substantive Review (Days)*
Overall Time-frame (Days)*
18
Substitution of acres in an irrigation non-expansion area/ flood damage
A.R.S. § 45-437.02
30
90
120
19
Substitution of acres in an irrigation non-expansion area/ impediments to efficient irrigation
A.R.S. § 45-437.03
30
90
120
20
Reversal of substitution of acres irrigated with Central Arizona Project water
A.R.S. § 45-452(G)
30
90
120
21
Type 1 non-irrigation grandfathered right associated with irrigation land retired 1965-1980
A.R.S. §§ 45-463, 45-476.01, and 45- 476
30
90
120
22
Type 2 non-irrigation grandfathered right
A.R.S. §§ 45-464, 45-476.01, and 45- 476
30
90
120
23
Irrigation grandfathered right
A.R.S. §§ 45-465, 45-476.01, and 45- 476
30
90
120
24
Substitution of acres in an active management area/flood damaged acres
A.R.S. § 45-465.01
30
90
120
25
Substitution of acres in an active management area/ impediments to efficient irrigation
A.R.S. § 45-465.02
30
90
120
26
Type 1 non-irrigation right retired after 6/12/80
A.R.S. § 45-469
30
90
120
27
Restoration of retired irrigation grandfathered right
A.R.S. § 45-469(O)
30
90
120
28
Revised certificate for new or additional points of withdrawal for a Type 2 right
A.R.S. § 45-471(C)
45
135
180
29
Conveyance of irrigation grandfathered right for electrical energy generation
A.R.S. § 45- 472(B)(2)
30
90
120
30
Conveyance of irrigation grandfathered right for non- irrigation use within service area
A.R.S. § 45-472(C)
30
90
120
31
Contract to supply groundwater
A.R.S. § 45-492(C)
15
90
105
32
Extension of service area to provide disproportionally large amount of water to large user
A.R.S. § 45- 493(A)(2)
15
90
105
33
Addition/exclusion of acres by irrigation district
A.R.S. § 45- 494.01(A)
30
90
120
No.
License
Legal Authority
Completeness Review (Days)*
Substantive Review (Days)*
Overall Time-frame (Days)*
34
Delivery of groundwater from an irrigation district to a general industrial use permit holder
A.R.S. § 45-497(B)
15
60
75
35
Issuance/renewal/modification of dewatering permit
A.R.S. §§ 45-513 and 45-527
30
70
100
36
Issuance/renewal/modification of mineral extraction and metallurgical processing permit
A.R.S. §§ 45-514 and 45-527
30
70
100
37
Issuance/renewal/modification of general industrial use permit
A.R.S. §§ 45-515, 45-521, 45-522, 45- 523, 45-524, and 45- 527
30
70
100
38
Issuance/renewal/modification of poor quality groundwater withdrawal permit
A.R.S. §§ 45-516 and 45-527
30
70
100
39
Issuance/renewal/modification of temporary permit for electrical energy generation
A.R.S. §§ 45-517 and 45-527
30
70
100
40
Issuance/extension/ modification of temporary dewatering permit
A.R.S. §§ 45-518 and 45-527
30
70
100
41
Emergency temporary dewatering permit
A.R.S. § 45-518(D)
3
7
10
42
Issuance/renewal/modification of drainage water withdrawal permit
A.R.S. §§ 45-519 and 45-527
30
70
100
43
Issuance/renewal/modification of hydrologic testing permit
A.R.S. §§ 45-519.01,
45-521, 45-522, 45-
524, and 45-527
30
30
60
44
Change of location of use
A.R.S. §§ 45- 520(A),
45-521, and 45-527
30
30
60
45
Conveyance of a groundwater withdrawal permit
A.R.S. § 45-520(B)
30
30
60
46
Transportation of groundwater withdrawn in McMullen Valley Basin to an active management area
A.R.S. § 45-552(B)
45
105
150
47
Transportation of groundwater withdrawn in Harquahala irrigation non-expansion area to an initial active management area
A.R.S. § 45-554(B)
45
105
150
48
Transportation of groundwater withdrawn in Big Chino subbasin to an initial active management area
A.R.S. § 45-555(B)
45
105
150
No.
License
Legal Authority
Completeness Review (Days)*
Substantive Review (Days)*
Overall Time-frame (Days)*
49
Well spacing requirements for withdrawing groundwater for transportation to an active management area
A.R.S. § 45-559
45
105
150
50
Groundwater replenishment district’s preliminary or long- term replenishment plan **
A.R.S. § 45-576.03
As prescribed by A.R.S.
§ 45-576.03(A)
As prescribed by
A.R.S. § 45-576.03 (B), (C), (D), and (E)
As prescribed by
A.R.S. § 45-576.03
51
Conservation district or water
A.R.S. §§ 45-576.03,
As prescribed by
As prescribed by
As prescribed by
district long-term
45-576.02(C), and
A.R.S. § 45-576.03(I)
A.R.S. § 45-576.03(J),
A.R.S. § 45-576.03
replenishment plan **
45-576.02(E)
(K), (L), and (M)
52
Notice of intent to abandon a well
A.R.S. § 45-594 and
A.A.C. R12-15-816
15
15
30
53
Well construction request for variance
A.R.S. §§ 45-594, 45-596(D), and
A.A.C. R12-15-820
15
35
50
54
Well driller license
A.R.S. § 45-595(C)
25
105
130
55
Single well license
A.R.S. § 45-595(D)
25
105
130
56
Renewal or reactivation of well drilling license
A.R.S. § 45-595(C)
A.A.C. R12-15-806
25
15
40
57
Notice of intent to drill
A.R.S. § 45-596, and
A.A.C. R12-15-810
15
0
15
58
Well construction permit
A.R.S. § 45-599
30
60
90
59
Alternative water measuring devices
A.R.S. § 45-604 and
A.A.C. R12-15-909
15
60
75
60
Underground storage facility permit
A.R.S. §§ 45-811.01
and 45-871.01
As prescribed by A.R.S. § 45-871.01(B)
As prescribed by
A.R.S. § 45- 871.01(D), (G), and (H)
As prescribed by
A.R.S. § 45-871.01
61
Groundwater savings facility permit
A.R.S. §§ 45-812.01
and 45-871.01
As prescribed by A.R.S.
§ 45-871.01(B)
As prescribed by A.R.S. § 45-871.01(D), (G), and (H)
As prescribed by
A.R.S. § 45-871.01
62
Storage facility permit renewal/conveyance/ modification
A.R.S. §§ 45-814.01
and 45-871.01
As prescribed by A.R.S.
§ 45-871.01(B)
As prescribed by A.R.S. § 45-871.01(D), (G), and (H)
As prescribed by
A.R.S. § 45-871.01
63
Water storage permit modification/conveyance
A.R.S. §§ 45-831.01
and 45-871.01
As prescribed by A.R.S. §§ 45-831.01(G)
and 45-871.01(B) and (E)
As prescribed by
A.R.S. §§ 45- 831.01(G) and 45- 871.01(D), (E), (G), and (H)
As prescribed by
A.R.S. §§ 45- 831.01(G) and 45- 871.01
64
Recovery well permit
A.R.S. §§ 45-834.01
and 45-871.01
As prescribed by A.R.S. § 45-871.01(B)
As prescribed by A.R.S. § 45-871.01(F), (G), and (H)
As prescribed by
A.R.S. § 45-871.01
65
Emergency temporary recovery well permit
A.R.S. § 45- 834.01(D)
5
10
15
66
Issuance/renewal/modification
A.R.S. §§ 45-1041,
As prescribed by
As prescribed by
As prescribed by
of water exchange permit
45-1042, and 45-
A.R.S. § 45-1042(A)
A.R.S. § 45-1042(B),
A.R.S. § 45-1042
1045
(C), and (D)
67
Modification of previously enrolled or permitted water exchange/non-Colorado River
A.R.S. § 45-1041(B)
60
90
150
No.
License
Legal Authority
Completeness Review (Days)*
Substantive Review (Days)*
Overall Time-frame (Days)*
68
Construction, enlargement, repair, alteration, or removal of a dam
A.R.S. §§ 45-1203, 45-1206, and 45- 1207
120
60
180
69
Weather modification license
A.R.S. § 45-1601
15
60
75
70
Certificate of Assured Water Supply
A.A.C. R12-15-702,
A.R.S. §§ 45-576 and 45-578
150
60
210
71
Designation or Modification of Designation of Assured Water Supply
A.A.C. R12-15-702 and R12-15-714;
A.R.S. § 45-576
150
60
210
72
Analysis of Assured Water Supply/unplatted development plan
A.A.C. R12-15-712,
A.R.S. § 45-576(H)
150
30
180
73
Assured Water Supply for State lands
A.A.C. R12-15-713,
A.R.S. § 37-334(F)
30
60
90
74
Water adequacy report
A.A.C. R12-15-716,
A.R.S. § 45-108
60
60
120
75
Designation or Modification of Designation of Adequate Water Supply
A.A.C. R12-15-716,
A.A.C. R12-15-725
A.R.S. § 45-108
150
60
210
76
Analysis of water adequacy/ unplatted
A.R.S. § 45-108
A.A.C. R12-15-723
60
60
120
77
Adequate Water Supply for State lands
A.R.S. § 45-108
A.A.C. R12-15-724
30
60
90
* The computation of days is prescribed by subsection (4).
** Hearing is required.
Historical Note
Adopted effective December 31, 1998; filed with the Office of the Secretary of State July 28, 1998 (Supp. 98-3).