Article 11. HOISTS AND SHAFTS  


Section R11-1-1101. Construction of headframes and material used
Section R11-1-1102. Design of headframes
Section R11-1-1103. Headframes constructed of flammable material
Section R11-1-1104. The sheave wheel platform and stairway
Section R11-1-1105. Reserved
Section R11-1-1106. Maintenance of information contained in Rope Record Book for friction hoists
Section R11-1-1107. Safety factors for friction hoist ropes, tail ropes, and guide and rubbing ropes
Section R11-1-1108. Use of hoisting rope, tail rope, guide or rubbing rope on friction hoist
Section R11-1-1109. Drum diameter of friction hoist
Section R11-1-1110. Design of friction hoist drives, controls, and brakes
Section R11-1-1111. Inspection of friction hoist rope treads
Section R11-1-1112. Installation of tapered guides or other approved installations on friction hoists
Section R11-1-1113. Emergency stopping device for friction hoists
Section R11-1-1114. Emergency stopping device provided for friction hoists when tail rope is used
Section R11-1-1115. Means provided to adjust depth indicator on fric- tion hoist
Section R11-1-1116. Level of water and spillage in shaft sump when friction hoist used
Section R11-1-1117. Positions of hoisting ropes within clamps, for fric- tion hoists, examined
Section R11-1-1118. Manufacturer shall provide certificate giving maximum rated unbalanced load and maximum rated sus- pended load for friction hoist
Section R11-1-1119. Alterations of friction hoist capacity prohibited
Section R11-1-1120. Determination of maximum material load allowed on conveyance of friction hoist
Section R11-1-1121. Inspection of shafts used for hoisting or lowering men
Section R11-1-1122. Protection from falling ground
Section R11-1-1123. Repealed
Section R11-1-1124. Platform suspended by wire ropes in shaft sink- ing
Section R11-1-1125. Rope guides
Section R11-1-1126. Substantial platforms required for shaft inspec- tion and repair work
Section R11-1-1127. Use of crane in shaft sinking operations
Section R11-1-1128. Reserved
Section R11-1-1129. Reserved
Section R11-1-1130. Reserved
Section R11-1-1131. Mine hoist drives
Section R11-1-1132. Rated capacities of hoists
Section R11-1-1133. Automatic hoists
Section R11-1-1134. Flanges on drums
Section R11-1-1135. Maximum fleet angle
Section R11-1-1136. Brakes on man hoists
Section R11-1-1137. Lock mechanism on hoists to prevent accidental clutch withdrawal
Section R11-1-1138. Devices for man hoists to prevent overtravel
Section R11-1-1139. Indicator of cage, skip bucket or cars
Section R11-1-1140. Placement of hoist controls
Section R11-1-1141. Physical examination for hoisting engineers and trainees
Section R11-1-1142. Hoisting engineer’s duties while hoist in motion
Section R11-1-1143. Due caution while hoist in motion
Section R11-1-1144. Hoisting engineer report all defects
Section R11-1-1145. Hoisting engineer must understand signal
Section R11-1-1146. If hoist down for eight hours
Section R11-1-1147. Hoisting engineer qualifications
Section R11-1-1148. Experienced hoistmen shall operate hoist
Section R11-1-1149. Hoisting engineer shall familiarize himself with all signals
Section R11-1-1150. Notification to hoisting engineer when men are working in compartment
Section R11-1-1151. Renumbered
Section R11-1-1152. Hoist ropes inspected
Section R11-1-1156. Attaching the rope to the load
Section R11-1-1153. Discarding of wire cable or rope used for hoisting
Section R11-1-1154. Splicing wire cable or hoisting rope
Section R11-1-1155. Static-load safety factors for selecting ropes for hoisting men
Section R11-1-1157. Inspection of materials
Section R11-1-1158. Use of emergency chains
Section R11-1-1159. Signal by the cager
Section R11-1-1160. Cagers shall report all defects
Section R11-1-1161. Getting on cages
Section R11-1-1162. After signal given to move cage
Section R11-1-1163. Signal to move cage
Section R11-1-1164. Use of metal bonnet
Section R11-1-1165. Providing means for blocking cars when hoisted
Section R11-1-1166. Reporting materials or tools dropped in shaft
Section R11-1-1167. Hoisting materials or tools
Section R11-1-1168. Testing of safety devices
Section R11-1-1169. Smoking on conveyance used to lower or hoist men, ore or equipment
Section R11-1-1170. No open hooks used to hoist
Section R11-1-1171. Use of buckets to hoist men
Section R11-1-1172. Buckets to hoist men during shaft sinking
Section R11-1-1173. Lowering of conveyances
Section R11-1-1174. Hoisting materials and men in same shaft
Section R11-1-1175. Lowering and hoisting buckets
Section R11-1-1176. Approved methods of signaling
Section R11-1-1177. Gates for shaft landings
Section R11-1-1178. Stop blocks
Section R11-1-1179. Getting on or off moving cage
Section R11-1-1180. Method provided to signal hoist operator from cage
Section R11-1-1181. Reserved
Section R11-1-1182. Diesel or fuel-injection engine used to power hoist
Section R11-1-1183. Renumbered
Section R11-1-1184. Cable secured to hoist drum
Section R11-1-1185. Location of hoisting signal devices during shaft sinking
Section R11-1-1186. Construction of loading pockets
Section R11-1-1187. Reserved
Section R11-1-1188. Reserved
Section R11-1-1189. Reserved
Section R11-1-1190. Elevator inspection