Section R18-9-A313. Facility Installation, Operation, and Mainte- nance for On-site Wastewater Treatment Facilities
All data is extracted from pdf, click here to view the pdf.
-
A. Facility installation. In addition to installation requirements in the general permit, the applicant shall ensure that the follow- ing tasks are performed, as applicable:
1. The facility is installed as described in design documents submitted with the Notice of Intent to Discharge;
2. Components are installed on a firm foundation that sup- ports the components and operating loads;
3. The site is prepared to protect native soil beneath the soil absorption area and in adjacent areas from compaction, prevent smeared absorption surfaces, minimize distur-
a. Influent wastewater quality;
b. The pressurized dosing system;
c. The aggregate infiltration bed and mound system;
d. Wastewater delivery and the engineered pad;
e. The pressurized delivery system, filter, underdrain, and native soil absorption system;
f. Saturation condition status in peat and other media; and
g. Treatment system components;
11. Inspect tanks, liners, ports, seals, piping, and appurte- nances for watertightness under all operational condi- tions;
12. Manage vegetation in areas that contain components sub- ject to physical impairment or damage due to root inva- sion or animals;
13. Maintain drainage, berms, protective barriers, cover materials, and other features; and
14. Maintain the usefulness of the reserve area to allow for repair or replacement of the on-site wastewater treatment facility.