Section R14-2-906. Special (Non-Streamlined) COPT Tariff  


Latest version.

All data is extracted from pdf, click here to view the pdf.

  • A.      Instead of concurring with the Generic (Streamlined) COPT Tariff, a COPT provider may file a proposed Special (Non- Streamlined) COPT Tariff with an application for a CC&N submitted pursuant to R14-2-902.

    B.       The Commission shall analyze each proposed Special (Non- Streamlined) COPT Tariff on an individual basis. In reviewing the proposed Special (Non-Streamlined) COPT Tariff, the Commission shall consider the standards listed in R14-2- 905(B).

    C.      While a proposed Special (Non-Streamlined) COPT Tariff is pending before the Commission, the COPT provider shall comply with the provisions of the Generic (Streamlined) COPT Tariff.

    D.      Following a hearing, the Commission may approve, modify, or reject any proposed Special (Non-Streamlined) COPT Tariff.

    E.       Changes may be made to a Special (Non-Streamlined) COPT Tariff as a result of a tariff filing made pursuant to A.R.S. § 40- 250(B) or an individual rate proceeding.

Historical Note

Adopted effective September 16, 1992 (Supp. 92-3).