Section R14-2-2413. Baseline Estimation  


Latest version.

All data is extracted from pdf, click here to view the pdf.

  • A.      To determine the baseline, an affected utility shall estimate the level of electric demand and consumption and the associated costs that would have occurred in the absence of a DSM pro- gram or DSM measure.

    B.       For demand response programs, an affected utility shall use customer load profile information to verify baseline consump- tion patterns  and the peak demand savings  resulting  from demand response actions.

    C.      For installations or applications that have multiple fuel choices, an affected utility shall determine the baseline using the same fuel source actually used for the installation or appli- cation.

Historical Note

New Section made by final rulemaking at 16 A.A.R.

2254, effective January 1, 2011 (Supp. 10-4).