Section R12-15-1303. Well Spacing Requirements - Applications for Recovery Well Permits Under A.R.S. § 45-834.01  


Latest version.

All data is extracted from pdf, click here to view the pdf.

  • A.      The director shall not approve an application for a recovery well permit under A.R.S. § 45-834.01 that is filed for a new well as defined in A.R.S. § 45-591 or, except as provided in

    A.R.S. § 45-834.01(B)(2) or (3), for an existing well as defined in A.R.S. § 45-591, if the director determines that the recovery of stored water from the proposed well or wells will cause unreasonably increasing damage to surrounding land or

    (B)(3) of this Section:

    1.        If the proposed recovery well is a replacement well in a new location, the director shall take into account the col- lective effects of reducing or terminating withdrawals from the well being replaced combined with the proposed recovery of stored water from the replacement well if the applicant submits a hydrological study demonstrating those collective effects to the satisfaction of the director.

    2.        If the proposed recovery well will be located within the area of impact, as defined in A.R.S. § 45-802.01, of an underground storage facility and the applicant will account for all of the water recovered from the well as water stored at the facility, the director shall take into account the effects of water storage at the facility on the proposed recovery of stored water from the recovery well if the applicant submits a hydrological study demonstrat- ing those effects to the satisfaction of the director.

    D. If the director determines under subsection (B)(1) of this Sec- tion that the probable impact of the recovery of stored water from the proposed recovery well or wells on any well of record in existence as of the date of receipt of the application will exceed 10 feet of additional drawdown after the first five years of operation of the proposed well or wells, the director shall notify the applicant in writing of the location of the wells of

    wells to lessen the degree of impact on wells of record or regional land subsidence; or

    2.   Agree to construct or operate the proposed recovery well or wells in a manner that lessens the degree of impact on wells of record or regional land subsidence. The director shall indicate in the recovery well permit that compliance with the agreement is a condition of the recovery well permit.

Historical Note

New Section made by final rulemaking at 12 A.A.R.

2193, effective August 7, 2006 (Supp. 06-2).